Housing · Supply · England · 2024–25

Supply: where does the housing pipeline stall?

England added 208,600 homes in 2024–25, the fewest since 2015–16, well short of the roughly 300,000 a year implied by the government's aim of 1.5 million homes this Parliament. Permission is only one step: land, infrastructure, finance, builders and buyers all have to line up before a home is finished.

Evidence last reviewed 3 October 2026

Permission is one step; a completed home is the outcome

HOUSE-03 · Where can a home get stuck?

Five steps, each with its own bottleneck

A mechanism diagram, not a funnel: the steps are equal-sized because the counts at each step come from different years and cohorts and cannot be chained into conversion rates.

From land to an occupied home

  1. 1

    Land and a local plan

    Sites must be allocated in a local plan or come forward as windfall. Many councils’ plans are out of date, which slows decisions and invites appeals.

  2. 2

    Planning permission

    A permission is necessary but not sufficient. A high approval rate excludes applications never made and says nothing about delays after approval.

    More on this step
  3. 3

    Infrastructure and finance

    Roads, schools, water and grid connections, plus conditions such as nutrient neutrality, can hold up permitted sites. Builders also need finance at viable interest rates.

  4. 4

    Construction

    Builders start 124,830 homes a year on the building-control count (2025); large sites are built out at the pace builders expect to sell — the “absorption rate” identified by the Letwin review.

  5. 5

    Occupied home

    Net additions count new builds plus conversions and change of use, minus demolitions: 208,600 in 2024–25.

How many homes are being added?

How many homes is England adding each year?

Net additions have fallen for 3 years running and are far below 300,000

Net additional dwellings (new builds, conversions and changes of use, minus demolitions), England, financial years. Dashed line: about 300,000 a year, the annual rate implied by the government’s aim of 1.5 million homes in England over the Parliament from July 2024.

England · 2006–07 to 2024–25
Net additional dwellings0k100k200k300k2006–072010–112014–152018–192022–232024–25209k≈300k a year aim
Supply recovered from the post-crash low of 130,611 in 2012–13 to almost 250,000 before the pandemic, then fell back. In 2024–25, 190,602 of the 208,600 were new builds and about 18,000 came from conversions and change of use (such as offices turned into flats), net of demolitions. England has not added 300,000 homes in a year at any point in this series.

England · 2006–07 to 2024–25 · Official statistics

Sources, definitions and data — Net additions have fallen for 3 years running and are far below 300,000
Geography:
England
Measure:
Homes
Period:
2006–07 to 2024–25
Status:
Official statistics
Calculation:
As published (Live Table 120).
Compare with:
About 300,000 a year (1.5 million over five years, set in July 2024; earlier governments had a 300,000-a-year ambition from 2017)
Not included / breaks:
Net additions are the most complete measure of supply. They are not the same as building-control completions, which count new builds only and miss some — see the next chart.

Source: MHCLG, Housing supply: net additional dwellings, England, Live Table 120 (released 20 November 2025). Chart HOUSE-10.

View the data as a table
YearNet additionsOf which new build
2006–07214,936193,080
2007–08223,534200,300
2008–09182,767157,630
2009–10144,870124,198
2010–11137,394117,695
2011–12140,785128,159
2012–13130,611118,536
2013–14142,494130,344
2014–15176,582155,078
2015–16195,534163,939
2016–17223,234183,571
2017–18228,170195,387
2018–19247,766214,413
2019–20248,591219,120
2020–21217,754191,819
2021–22234,462211,665
2022–23234,292212,364
2023–24221,409198,681
2024–25208,600190,602

Is the pipeline filling or emptying?

Starts fell sharply in 2024; completions are following them down

New dwellings started and completed, England, calendar years, building-control returns (all tenures).

England · 2000 to 2025

1996–2026 displayed window · observations only. Shading marks years outside the displayed record.

Dwellings a yearNo observations shown0k50k100k150k200k200020102020125k142k
Starts are the best early warning for future supply. They fell from 182,070 in 2022 to 108,830 in 2024 as mortgage rates and build costs rose and buyers held back, and recovered only partly to 124,830 in 2025. Completions, which follow starts, fell to 142,050. This points to net additions staying low in the near term, whatever happens to planning.

England · 2000 to 2025 · Official statistics

Sources, definitions and data — Starts fell sharply in 2024; completions are following them down
Geography:
England
Measure:
Dwellings
Period:
2000 to 2025
Status:
Official statistics
Calculation:
As published.
Compare with:
Starts lead completions by roughly one to two years
Not included / breaks:
Building-control counts miss some new homes (not all approved inspectors report), so they run below net additions. Use them for direction, not level.

Source: MHCLG, Live tables on house building: new build dwellings, Table 209 (calendar years). Chart HOUSE-11.

View the data as a table
YearStartsCompletions
2000142,610135,100
2001146,770129,510
2002150,700136,800
2003161,280144,060
2004176,680154,060
2005173,900159,450
2006170,610160,850
2007183,600176,640
2008106,890148,010
200985,600124,970
2010110,660106,720
2011113,260114,020
2012101,020115,590
2013124,790109,440
2014140,760117,810
2015148,150142,470
2016155,150141,870
2017164,110162,480
2018168,610165,490
2019153,000177,880
2020129,440146,650
2021177,160174,940
2022182,070178,350
2023150,600163,270
2024108,830153,850
2025124,830142,050

Why supply is low: competing explanations

Planning. Too little land is permitted where demand is highest, decisions are slow and uncertain, and out-of-date local plans invite appeals. This is the government’s main diagnosis and the target of the Planning and Infrastructure Act 2025.

Build-out and the housebuilder model. The Letwin review (2018) found that large sites are built out at the rate builders expect to sell homes without lowering local prices — the “absorption rate” — so more permissions on the same sites do not by themselves speed delivery. Different types and tenures of home on large sites can raise the rate.

Demand and the cost of money. When mortgage rates rose in 2022–23, buyers held back and builders cut starts. The 2024 fall in starts happened with planning rules largely unchanged, which suggests demand and costs, not only permission, drive the short-term path.

Capacity and costs. Construction workers, materials and infrastructure connections (water, grid, nutrient neutrality rules in some catchments) limit how fast permitted sites can be built.

Each explanation points to a different lever, which is why the options on the Housing page are compared step by step. Planning applications and approvals over time are on planning applications and decisions; the options are in What would move the needle?

Sources and methods (3)

Method notes

  • Net additional dwellings (Live Table 120) is the most complete measure of supply: new builds plus conversions and change of use, minus demolitions, by financial year.
  • Starts and completions are building-control counts by calendar year and undercount new homes; use them for direction, not level.
  • The 300,000 reference is the annual average implied by the aim of 1.5 million homes in England over the Parliament; it is not an official annual target.