Housing · Supply · England · 2024–25
Supply: where does the housing pipeline stall?
England added 208,600 homes in 2024–25, the fewest since 2015–16, well short of the roughly 300,000 a year implied by the government's aim of 1.5 million homes this Parliament. Permission is only one step: land, infrastructure, finance, builders and buyers all have to line up before a home is finished.
Evidence last reviewed 3 October 2026
Permission is one step; a completed home is the outcome
HOUSE-03 · Where can a home get stuck?
Five steps, each with its own bottleneck
A mechanism diagram, not a funnel: the steps are equal-sized because the counts at each step come from different years and cohorts and cannot be chained into conversion rates.
From land to an occupied home
- 1
Land and a local plan
Sites must be allocated in a local plan or come forward as windfall. Many councils’ plans are out of date, which slows decisions and invites appeals.
- 2
Planning permission
A permission is necessary but not sufficient. A high approval rate excludes applications never made and says nothing about delays after approval.
More on this step - 3
Infrastructure and finance
Roads, schools, water and grid connections, plus conditions such as nutrient neutrality, can hold up permitted sites. Builders also need finance at viable interest rates.
- 4
Construction
Builders start 124,830 homes a year on the building-control count (2025); large sites are built out at the pace builders expect to sell — the “absorption rate” identified by the Letwin review.
- 5
Occupied home
Net additions count new builds plus conversions and change of use, minus demolitions: 208,600 in 2024–25.
How many homes are being added?
How many homes is England adding each year?
Net additions have fallen for 3 years running and are far below 300,000
Net additional dwellings (new builds, conversions and changes of use, minus demolitions), England, financial years. Dashed line: about 300,000 a year, the annual rate implied by the government’s aim of 1.5 million homes in England over the Parliament from July 2024.
England · 2006–07 to 2024–25 · Official statistics
Sources, definitions and data — Net additions have fallen for 3 years running and are far below 300,000
- Geography:
- England
- Measure:
- Homes
- Period:
- 2006–07 to 2024–25
- Status:
- Official statistics
- Calculation:
- As published (Live Table 120).
- Compare with:
- About 300,000 a year (1.5 million over five years, set in July 2024; earlier governments had a 300,000-a-year ambition from 2017)
- Not included / breaks:
- Net additions are the most complete measure of supply. They are not the same as building-control completions, which count new builds only and miss some — see the next chart.
Source: MHCLG, Housing supply: net additional dwellings, England, Live Table 120 (released 20 November 2025). Chart HOUSE-10.
View the data as a table
| Year | Net additions | Of which new build |
|---|---|---|
| 2006–07 | 214,936 | 193,080 |
| 2007–08 | 223,534 | 200,300 |
| 2008–09 | 182,767 | 157,630 |
| 2009–10 | 144,870 | 124,198 |
| 2010–11 | 137,394 | 117,695 |
| 2011–12 | 140,785 | 128,159 |
| 2012–13 | 130,611 | 118,536 |
| 2013–14 | 142,494 | 130,344 |
| 2014–15 | 176,582 | 155,078 |
| 2015–16 | 195,534 | 163,939 |
| 2016–17 | 223,234 | 183,571 |
| 2017–18 | 228,170 | 195,387 |
| 2018–19 | 247,766 | 214,413 |
| 2019–20 | 248,591 | 219,120 |
| 2020–21 | 217,754 | 191,819 |
| 2021–22 | 234,462 | 211,665 |
| 2022–23 | 234,292 | 212,364 |
| 2023–24 | 221,409 | 198,681 |
| 2024–25 | 208,600 | 190,602 |
Is the pipeline filling or emptying?
Starts fell sharply in 2024; completions are following them down
New dwellings started and completed, England, calendar years, building-control returns (all tenures).
1996–2026 displayed window · observations only. Shading marks years outside the displayed record.
England · 2000 to 2025 · Official statistics
Sources, definitions and data — Starts fell sharply in 2024; completions are following them down
- Geography:
- England
- Measure:
- Dwellings
- Period:
- 2000 to 2025
- Status:
- Official statistics
- Calculation:
- As published.
- Compare with:
- Starts lead completions by roughly one to two years
- Not included / breaks:
- Building-control counts miss some new homes (not all approved inspectors report), so they run below net additions. Use them for direction, not level.
Source: MHCLG, Live tables on house building: new build dwellings, Table 209 (calendar years). Chart HOUSE-11.
View the data as a table
| Year | Starts | Completions |
|---|---|---|
| 2000 | 142,610 | 135,100 |
| 2001 | 146,770 | 129,510 |
| 2002 | 150,700 | 136,800 |
| 2003 | 161,280 | 144,060 |
| 2004 | 176,680 | 154,060 |
| 2005 | 173,900 | 159,450 |
| 2006 | 170,610 | 160,850 |
| 2007 | 183,600 | 176,640 |
| 2008 | 106,890 | 148,010 |
| 2009 | 85,600 | 124,970 |
| 2010 | 110,660 | 106,720 |
| 2011 | 113,260 | 114,020 |
| 2012 | 101,020 | 115,590 |
| 2013 | 124,790 | 109,440 |
| 2014 | 140,760 | 117,810 |
| 2015 | 148,150 | 142,470 |
| 2016 | 155,150 | 141,870 |
| 2017 | 164,110 | 162,480 |
| 2018 | 168,610 | 165,490 |
| 2019 | 153,000 | 177,880 |
| 2020 | 129,440 | 146,650 |
| 2021 | 177,160 | 174,940 |
| 2022 | 182,070 | 178,350 |
| 2023 | 150,600 | 163,270 |
| 2024 | 108,830 | 153,850 |
| 2025 | 124,830 | 142,050 |
Why supply is low: competing explanations
Planning. Too little land is permitted where demand is highest, decisions are slow and uncertain, and out-of-date local plans invite appeals. This is the government’s main diagnosis and the target of the Planning and Infrastructure Act 2025.
Build-out and the housebuilder model. The Letwin review (2018) found that large sites are built out at the rate builders expect to sell homes without lowering local prices — the “absorption rate” — so more permissions on the same sites do not by themselves speed delivery. Different types and tenures of home on large sites can raise the rate.
Demand and the cost of money. When mortgage rates rose in 2022–23, buyers held back and builders cut starts. The 2024 fall in starts happened with planning rules largely unchanged, which suggests demand and costs, not only permission, drive the short-term path.
Capacity and costs. Construction workers, materials and infrastructure connections (water, grid, nutrient neutrality rules in some catchments) limit how fast permitted sites can be built.
Each explanation points to a different lever, which is why the options on the Housing page are compared step by step. Planning applications and approvals over time are on planning applications and decisions; the options are in What would move the needle?
Sources and methods (3)
- MHCLG, Housing supply: net additional dwellings, England, Live Table 120 (released 20 November 2025) — net additional dwellings and the new-build component
- MHCLG, Live tables on house building: new build dwellings, Table 209 (calendar years) — starts and completions
- Sir Oliver Letwin, Independent review of build out: final report (October 2018) — build-out rates on large sites
Method notes
- Net additional dwellings (Live Table 120) is the most complete measure of supply: new builds plus conversions and change of use, minus demolitions, by financial year.
- Starts and completions are building-control counts by calendar year and undercount new homes; use them for direction, not level.
- The 300,000 reference is the annual average implied by the aim of 1.5 million homes in England over the Parliament; it is not an official annual target.